onsdag den 12. november 2008

10 - 12/11-08

10/11

Getting settled, moving tables randomly around, hook up computers and network.

We also went downtown to by some lamps and stuff to make our workspace more cosy.



11/11

Preparation for meeting with Michelle and Tod. Drawing some designs. Collect referance and inspiration.

Metting with Michelle and Tod.

Story meeting. Came up with 5 new endings.

Drawing storybeats in the afternoon.


12/11

Pipeline lecure

Group meeting. Talked about what we want do get out of the project and what each of us want to work with etc:
Anders: Responsible for Bg's and visual look, story dev and modeling.
Peter: Rigging lead, animation lead, character design, story, modeling.
Alice: design, layout, storyboard, modeling.
Me: Directing, modeling, rigging, pipeline, rendering and composite.

Story meeting:
Came up with another five ending and additional storybeats.

Making the Elkharcaddis blogs.

Rest of the day making concept art.

Ingen kommentarer: